Sunday, October 11, 2015

Tried something new,

And it worked!
Got some ballast down today.
The last layout and my old Free-Mo modules used Woodland Scenics products. I wasn't completely thrilled with the way the Woodland Scenics ballast behaved. When I applied the glue, I would wind up with an inordinate amount of  "floaters". Which would have to be scrapped off once the glue had set, prior to laying rail.
Turns out that the Woodland Scenics ballasts are made from crushed walnut shells, which would explain the floaters.
This time I turned to Scenic Express and used their line of crushed stone ballasts.
The mainline is ballasted with their fine light gray while the spurs are being done with their light cinders blend.
The dust in the cinders has darkened the ties considerably, and I'll have to find a way to address that. But generally I'm very pleased with the results.
AND NO FLOATERS!
I only do a preliminary ballasting so has to prep for laying the rail. Once scenery is in, I'll come back and clean up the edges and such.
I don't ballast turnouts before laying the track, since I've had nothing but trouble in the past gluing points shut.
Onward!

Saturday, October 10, 2015

Little bitty bits of wood II

It's starting to look like a railroad!
3,500 ties so far. Glued down, sanded and stained.
Think I have to buy more ties soon.
Ballasting has started, and once that is done out comes the rail.

All Better Now

The bridge is now sitting as it should.
The rails rest on the ties and on the bridge bearings.
I had to toss the cast metal bearings from Micro Engineering and cobble up my own, but once they're painted black, they'll mostly disappear.
It took about an hour to trim the footings for the piers and reglue them back into place.
My thanks to all who offered up suggestions to resolve this issue, with one notable exception. Chris is clearly still suffering after affects from the caulk in the eye incident in the Train Masters TV studio earlier this year.
With things back on "track", the actual rail and ties were glued down and the first acid test performed.
The bridge seems to support Tilley. That's good news.
Now for the next step.
All this strip wood will become the walkway that ran the full length on the north side of the bridge.
That'll be finicky.



Friday, October 9, 2015

GRRRRRRRRRRRRR!

There is nothing I hate more than having to redo something.
Particularly when it's my own damn fault.
Late yesterday I realized that the whole bridge assembly was sitting too high as compared to the ties leading to it. By 0.040"!
Where the error actually occurred is a bit of a mystery to me, but it doesn't matter. The bridge needs to be lowered.
The bridge bearing castings from Micro Engineering will be replaced with scratch built items that will be 0.170" high and then the cast footings will have to sanded to fit and reinstalled.
And I had thought I was being super careful watching the heights and making allowances for the various bits and pieces.
Damn, damn, damn!

Thursday, October 8, 2015

Up on Kettle Creek Part III

Hey look! It fits in the space created for it!
As you can see, the truss span is painted. It does have rivets applied, but that'll get covered at a later date.
I recycled the abutments and the pier footings from the old layout. Spent a little time fiddling the footings into place, shimming, filing as required.
The actual deck is being painted and then it will get glued in place. The whole bridge will not be secured in place for some time to come. I have much scenery work to do before that can happen.
Mmmmm. Scenery!

Wednesday, October 7, 2015

Little bitty bits of wood.

So my wife calls them.
She really hasn't seen the scale 1x2 in the shop yet.
But we're laying ties! It's looking a lot like a railroad suddenly.

 All the switch ties are now in place and I can start filling in the mainline and the spurs with ties.
I'm using the Tie Racks from Fast Tracks to assist in the laying out of the ties. I'll be using a different tie centre spacing for the main as compared to the siding tracks. It should make for a nice detail.
Once all the ties are glued down , I'll sand them and stain then add ballast before starting to lay track.
However the very first bit of track to be built will be the 3 diamonds along the L&PS right of way.
Who's idea was this anyway?




Tuesday, October 6, 2015

Treasures from Tim

Took a lovely drive down Highway #3 Monday afternoon.
My latest order from Fast Tracks was ready for pickup. So off to Port Dover I went.
Turnout tie strips in abundance. Printed circuit board ties, wood ties and "Tie Rack Tie jigs". And the 90 degree diamond fixture.
I now have all the bits required to lay track in the St Thomas yard.
Tim Warris and I also discussed solving a little challenge I have regarding a double 75 degree diamond I need where the L&PS crosses the Wabash main. (More on that in the future)
First I have to make more progress on the Kettle Creek bridge before I'm ready to really start swinging the hammer in the yard.
Now to find the time...