Wednesday, November 4, 2015

My Worst Fears...

Did not come to fruition.
The 2 O scale cars you see are being decaled and will soon be on the way to their proper home.
Both of these cars a rather old Chooch kits. The MILW car kit dates from the mid-80s!
In both cases I was very much concerned about the decals.
The MILW car came with conventional water-slide decals. Being as old as they were I was concerned that they would fracture and turn into many little pieces when they were immersed in water. For those decals I took precautionary measures and coated the decal sheet with MicroScale liquid decal film. The product basically adds a layer of film over the old decal, holding it all together.
The D&RGW car was another matter. All we had for this car was dry transfers, which are notorious for having a limited shelf life. For those I took a different route.
I took a sheet of clear film, sprayed a coat of flat over it. ( A needed step for dry transfers. They don't adhere well to glossy surfaces.) Then I simply transferred the desired lettering onto the clear film by rubbing with a pencil, and then sealed it all with a coat of liquid decal film. The old dry transfers went onto the decal paper with nary an issue.
From there it was a simple matter of decaling in the traditional manner.
I still can't get over how massive the 50' D&RGW car is, especially compared to an HO car below it.

Thursday, October 29, 2015

Turnouts this day!

First one installed!
Feeder wires added before spiking and gluing into place.
I've said it before, and I'll say it again. The Fast Tracks system is brilliant! Thanks Tim Warris.
It was so much fun and easy that last night, after getting the first one in, I got three more added in the yard ladder.
The only grumble moment in all this is the spikes. The Micro Engineering spikes have over-length heads, which require clipping to work properly with the system. It's a good "in front of the TV project", but it wear's thin quickly.
And the other bit of completion is the Kettle Creek trestle.
With the walkway and railing in, brakemen can now safely work the trains on the west end yard lead.
There's much scenery to be added here before the trestle is finally secured in place. It'll be awhile, a few other things to do yet.




Tuesday, October 27, 2015

Another Naperville in the bag

And as always, I had fun!
While the actual attendance was down from years past, 250 total, I have few issues with last weeks RPM.
I got to see my friends from across North America. That alone makes the trip worth it for me.
Joe D'Elia has chosen to not continue hosting the show, but rather hand those duties over to Mike Skibbe of the Modutrak group. I've already spoken to Mike about options for next year and we have plans for some stuff already. Sorry no preview yet.
There has been some online grumbling about some of the clinics not satisfying some attendees. For those I have a message:
I firmly believe that RPMs are contributor driven. If you're finding the quality of the presentations aren't up to your personal standards, step forward on do a clinic yourself. Or encourage someone you know to do one. We all have something to share, and all have stuff we can learn. Standing on the sidelines and kvetching accomplishes nothing.
Speaking of friends and sharing, here's a couple of my friends operating on Bill Darnaby's layout last Wednesday.
Bill Welch awaiting his proper departure time from New Yard
And Jerry Hamsmith here has ventured forth from the operators position to sort out some minor disaster on the line.
Just the day of operating with these guys made the 7 hour drive well worth it.
I'm constantly intrigued as to how this hobby relies so much on camaraderie amongst  people who spend so much time alone in their respective basements.
As Bill says 'Onward!'


Monday, October 19, 2015

Naperville, Ho!

Actually it's Lisle, but who's counting?
Tomorrow morning it's into the van and a drive across Michigan to the suburbs of Chicago. For the 22nd Naperville Prototype Modelers Meet.
This annual event is a high light for me. I get to see and chat with friends that I've made over the years attending this fine event.
I'll be operating on 2 fantastic layouts as well. Bill Darnaby's Maumee Route and Robert Hanmer's GN/DMIR/SOO layout.
I've operated on Bill's layout before and it's always a treat. A tad stressful but well worth it. There's a lot going on and I still consider myself a novice with TT&TO operations. I live in fear of making a mistake there.
Robert's layout will be a whole new experience for me. I have no idea what to expect.
And of course there's the clinics and the bar.
Lots to do.
See you when I get home.

Friday, October 16, 2015

Only 10 more to go,

And I'll have enough for the St Thomas yard.
Yes, folks turnouts!
That's a pile of 12 you see. All built in Fast Tracks fixtures.
I need to add electrical wires to the frogs and the stock rails and then spray paint the pc board ties and then I can actually lay these bad boys in place.
Had a bit of an object lesson when I started these the other day. It was taking me about 45 minutes to build a turnout. Far longer than I remember it taking a few years ago. And I felt that I was working too hard filing the rails for the frogs, points and notching the stock rails.
So I wandered over the hardware store and bought a brand new 10" mill file.Turnouts now take 20-25 minutes a piece. Terrifying what a sharp file can do.
I do so little work in metal that I forget what a sharp file can feel like when it's being used.
Won't forget that detail very quickly.

Tuesday, October 13, 2015

And then there were three

 I spent a few hours today assembling the other 2 required diamonds. Here's the trio sitting where they will live. I have to paint them first, as well as add in all the regular ties required before gluing these guys down.
While fiddly, they weren't that hard to build. Just lots of little pieces of rail to create the guard rails and the inner bits of load bearing rails. The rails laid across the 75 degree diamonds are there to hold everything together until all is secured in place.
Wiring these would be a challenge but Hex frog Juicers can be used to help control polarity through the various frogs. Not that I need to do that. The L&PS run may not get wired. Depends how brave I'm feeling.




Monday, October 12, 2015

One down,

2 more to go.
The first of 3 diamonds that need to be built for the layout.
It is doubtful that I would have had the chutzpah to take these on without the benefit of the Fast Tracks assembly jigs. They really make short work of the otherwise very tricky trackwork.
I've also spent far too much time in front of the monitor today. I finally pulled together the 2 PowerPoint presentations I need for Naperville. Yes, that RPM is a little over a week away.
I'll be talking about Prototype Modeling from a Canadian perspective for the "Friends of the Freight Car" dinner and I have a clinic in reserve should a presenter have to bail at the last minute.
I really enjoy the RPM meets. I get to meet up with friends and like minded modelers from all over. We share stories, ideas, prototype history, etc. The meets, I firmly believe, are contributor driven. Without clinicians to share, these events are nothing. Consider presenting yourself one day soon. You may have that nugget of info that someone was looking for.