Sunday, July 12, 2015

And it all comes together.

A couple of days for decal application and these guys are done.

All they are waiting for is trucks and airhoses, but that'll take 1/2 an hour. The trucks are sitting in Port Huron, waiting for me to go and get them. Between waiting for etchings for the new kits and the foot surgery, traveling to Port Huron has not been an option.
I'm very pleased with how these cars have turned out. That whole SFRD paint scheme is a real eye catcher. It took a little time to get the orange right. The initial mix of 2 parts reefer yellow and one part reefer orange was way to orange. It's about 6-1 yellow to orange I think, using Scalecoat. And if I do another batch of these I'll vary the tone a little.
And many thanks to Ted Culotta who helped me out with the maps and slogans for 2 of the cars.
So how many can I do for you?

Saturday, July 11, 2015

What are they up to?

Yesterday I had a visitor up from Ohio. It's always great to see Bob. Usually we only meet up at the RPM in Naperville, but Bob felt the need to drop off the grid for a couple of days so he came to visit. His first time in to St Thomas. So he got the nickel tour of all the railroad related sites in town.
The old Pere Marquette facilities.
The L&PS trackage.
The CASO station and shops.
The Wabash yard and shops.
and the CPR interchange in the east end of town.
It was while I was showing him the footings of the Wabash roundhouse door posts that we came across this.
For some reason, they have scrapped off the soil that was covering this part of the old roundhouse floor.
Now I have yet another small mystery to solve. Whatever are they doing exposing this old floor? I can't conceive of a single good reason for this.
Fortunately we know a fellow who works for CNR who may be able to shed light on this. Now if he'd only answer his phone.

Wednesday, July 8, 2015

I really like,

The way that reefers evolve as they get finished.
It's fussy, fidgety work, that really rewards the efforts.
With multi-colour cars like this I add as much detail as I can on the flat cast sides and then paint the components before assembling the box. It saves me a lot of masking and the parts usually separate at the colour separation lines.
The cars really start to pop when the hardware gets painted. There's something about reefer door hinges.
With these cars I also did something I've not yet done before. Open ice hatches. At the clients request all the hatches are open and resting upon the hardware. I like the look.
I also took care to paint the actual plugs to represent canvas as I believe that canvas was used on the plugs.
Now for decals.
Stay tuned.


Tuesday, July 7, 2015

Progress this day II

Well the stitches are out of my toe.
The doctor and I are both very pleased with progress. And I'm mobile again. Yippee!
I have been working some, but the elevated foot requirements have restricted my time at the bench. But today following my return from the podiatrist real progress was seen in the shop.
Let's see what we've got here.
From back to front;
One classic resin kit. A Steam Shack CV end door autocar. How old is this kit? I'm pretty sure that it was one of the very first resin kits I ever built when it first came out decades ago. I was inspired by a product review in RMC, to acquire and build 2 of them. Who knew where it would lead to?
Beside the CV car are 2 Sunshine NYC Express Reefers. A pair of really nicely designed kits that reward the modeler with a very striking car when done.
Those 3 are just drying after getting the decals applied on the second side.
And in front are 3 Sunshine SFRD Rr-5-9, 11 ice reefers. They are now ready for detail painting and the application of the hatches. All the hatches will be open as per the clients request, so the first thing tomorrow is to paint the canvas plug covers on the hatches themselves, along with picking out in black all the hardware on the car sides.
Even though multi-colour reefers are extra work, I enjoy them. They are always pleasant to look at and reward the extra effort with their appeal.
Oh and lurking in the very back are the test castings for 2 new kits. So things are happening in that department as well.
So many models, so little time.


Sunday, July 5, 2015

More layout considerations.

One of the perils of having time on one's hands is the potential for thinking about one's options.
In my case, the wait for starting a new layout, in part imposed by bunion surgery, allows me to consider further options for what I want to recreate.
The last plan I thought about was limited to only 2 towns and lots of main line in between. Certainly an achievable layout and allows me to present the things I want to present and model. But something was lacking.
The Ontario Wabash operation was rather unique in Canada and I really want to showcase the Red Balls more than the 2 town option would have. And Steve Lucas' commentary on options got me thinking.
Why not include St Thomas?
It's a modest yard. It's principle operational function was to serve as a crew change point and an originating point for locals and mixed trains.
And running perpendicularly through it was the London and Port Stanley interurban line.
I'm fortunate in that I have a friend in London who will be able to tell me which tracks were used for which purpose. Such as which one is the caboose track. Where was the combine stored when not in use, etc.
In the era I model, 1951, through trains would stop in St Thomas and have the crews changed, which entailed a caboose swap, while motive power would not be swapped. The actual mechanics of the caboose swaps is interesting, as the process was greatly different for the east bound vs the west bound trains.
The west bound trains would stop about 1/2 a mile east of the station, once they were clear of the CPR diamond. The power would cut-off and run into the yard and there the crews would swap and the power would run back and re-connect to it's train. While this was going on, Tilly, the little 42 tonner, would hustle a caboose out for the new conductor.
The east bounds were rather different. With the motive power stopped in front of the station, the train would reach back west over the steel trestle over the Kettle Creek and likely foul the crossing at St George St. A little further west of St George St was the caboose pocket. A short little siding just long enough for a caboose and a small locomotive. Tilly would have to grab the required caboose and hustle out westward in advance of the arrival of an east bound Red Ball. Perform the caboose swap and return to the yard once the Red Ball had departed.
All of which would make for interesting operations.
So I'm strongly inclined right now to include St Thomas in the new layout. The wye will not be part of it. And possibly the roundhouse may be faked, as it's not integral to what I'm trying to present. We shall see how much space this all requires before the big choices are made.
But I will be able to create scenes like this.
Makes one wonder why not?


Tuesday, June 30, 2015

Free Trade, My A** II

Time for some grumbling.
So many of the items I use for Yarmouth Model Works are sourced from US based companies. And I'm not just talking about actual model parts.
Boxes, plastic baggies, printer friendly labels, etc. I source these from the US because the items I want are not available from Canadian suppliers.
The white mailer boxes that all my kits are shipped in are a basic box design, but that particular size is not available from any Canadian supplier and the closest size to it is twice the price. So I use a US packaging supplier for such items. The company I dealt with was recently bought out by another, the website changed and the phone numbers changed as well. The only phone number listed is a toll free number which doesn't work from Canada. So I had to email them to request the regular number. To the companies credit, they contacted me straight away and I could place my order.
Now before you go and tell me I should have just ordered online, the websites of most US based companies will not process orders with a Canadian based credit card, or let me use a different shipping address, such as my Port Huron address.
Frustrating but the company offered a work around.
Avery labels from Staples are another matter.
The size I require are available up here for laser jet printers only, which means I have to take them to the local Staples store to have them printed and the machines constantly mangle my expensive sheets of labels.
The ink jet version of the same size is only available in the US. To order them from Staples I have to present myself in person at the store in Port Huron, (an hour's drive), pay for the items and then return in a few days when they are delivered. The Staples website would not process an order for a non US resident. Grrrrrrrr.
Fortunately a friend who is sending me some stuff offered a work around. He will buy me the labels at his Staples store in Florida and mail them to me along with the other items he's sending to me.
I realize that Canada and the USA are different countries with many different laws and customs, but surely in this era of NAFTA and other such hokum, we can do better. I've never had to work so hard to spend my money.

Friday, June 26, 2015

How do you spell "Tedious"?

With my options for activities severely restricted while the toe heals, I took care of very tedious but very important job today.
We went from a stack of decal sheets like this;
To the paper cutter;
And then into plastic baggies;
Now the decals will fit into the kit boxes.
250 sheets sliced up with 3 cuts each, one sheet at a time. Hours of fun.
I decided some time ago, that rather than try to create a multitude of kits with the variety of slogans that the ATSF used on these cars, I would include one decal sheet that covered off all options. Modelers will be able to use surplus decals for other ATSF projects.
The ATSF kit will be offered as 3 different kits.
105.1 Bx-48, 50, 51. Square panel roof and Apex running boards
105.2 Bx-53, 60, 62 Diagonal panel roof and Apex running boards
105.3 Bx-63             Diagonal panel roof and USG running boards
I'm hoping to have kits in time for the St Louis RPM, otherwise it'll be Naperville.